1. Home
  2. /
  3. Queensland Health
  4. /
  5. St Vincent’s Care Toowoomba

St Vincent’s Care Toowoomba (February 2021 – March 2021)

Installation of 105 Commscope category 6 outlets for CCTV and Intercom links.


Installation of significant surface conduit and duct work due to existing building structure.

Installation of 4 x 12-core single-mode fibre links

Installation of 1 x 6-core multi-mode fibre link.

Installation of 2 new 45RU Communication Racks c/w 2 x PDU including vertical and horizontal cable management.

Installation of 4 x RCD protected 32-amp power circuits.

Vendor Warranty approved

NCH Electrical has the following endorsed certifications

© 2024 NCH Electrical | All Rights Reserved. | Developed by Procloud - Web Design Agency, Signage Brisbane & SEO Agency Brisbane

TOP