1. Home
  2. /
  3. Queensland Health
  4. /
  5. Redcliffe Hospital ICU

Redcliffe Hospital ICU (December 2020 – March 2021)

Installation of 205 category 6a shielded Belden outlets as part of the refurbishment of the new ICU.


Installation of new 12-core multi-mode fibre link

Installation of 300mm and 600mm Cable basket for new main pathways.

VTI Certification and vendor Warranty approved.

NCH Electrical has the following endorsed certifications

© 2024 NCH Electrical | All Rights Reserved. | Developed by Procloud - Web Design Agency, Signage Brisbane & SEO Agency Brisbane

TOP