Queensland Children’s Hospital – Level 7 Training Rooms (May 2020 – June 2020)

Installation of 2600 category 6a shielded Commscope outlets throughout the hospital campus.


Installation of 26 x OS2 12 core fibre links, 9 x 24 core OS2 fibre links and 2 x 72 core OS2 fibre links. Includes both internal and external fibres. These fibres were transitioned from external to internal as per QH standards where they entered the building.

Installation of various 50, 100 and 125 pair voice backbone links across campus and between racks all installed and labelled to QH standards. Installation of roughly 4km of labelled QH standard catenary wire.

Supply and installation of 36 QH standard comms racks of various QH set ups.

Installation of 864 Inter Rack Ties (i.e. 36 looms of 24)

On this project we installed the Nurse call and security cabling for the associated contractors.

Project was RCDD audited and passed.