1. Home
  2. /
  3. Queensland Health
  4. /
  5. Logan Hospital Carpark

Logan Hospital Carpark (May 2021 – Ongoing)

Installation of category 6a Siemon outlets as part of the new Logan Hospital multi-story carpark building.


Installation of 1 x 50 pair 0.64mm external rated voice link from new frame within communications room car park to external transition point.

Installation of transition point and internal 50m pair cabling from transition point to new vertical ‘H’ within Building 3.

Installation of Commscope 5-point self-resetting lightning protection for all pairs, both sides of the 50m pair link.

Installation of 6 x 4 core multi-mode Links from communications room to each individual camera location.

NCH Electrical has the following endorsed certifications

© 2024 NCH Electrical | All Rights Reserved. | Developed by Procloud - Web Design Agency, Signage Brisbane & SEO Agency Brisbane

TOP