AMAZON Fulfillment Centre Infrastructure Buildout (June 2020 – October 2020)

Project consists of a multi-million Amazon hub in Brisbane to be completed by Christmas, with construction fast-tracked due to COVID-19. The warehouse is said to be the size of two football fields.


Installation of 555 cat 6 shielded Siemon outlets, for new suspended wireless access points and CCTV cameras.

Installation of new fibre backbone cabling, 2 x 12 core Siemon single-mode fibre links.